凝聚科技光辉 成就行业兴隆

Equipment Installation

1.preparation of installing
main preparing work of the equipment::
(1)Refer to the guideline of installing, and try to use the raw material,necessary  tool and technique equipment according to the principle of the technology.
(2)Communicate with the customers in advance,prepare the workers of multiple production line and the man for fixing.
(3)Check and confirm the base map of installing equipment.
(4)To offer enough and effective space, get rid of the barrier.
(5)Mark  the middle line of the multiple production base map.
(6)Improve the situation of the installing space if necessary.
(7)If not get the real confirmation of the customer,check the main assisted facility,main eletricity source,main gas source, water input and output, etc. to avoid delaying the work.
2.Equipment installing.
Equipment position.Organize the worker to do transporting job according to the craft surface arrangeing  map which drawn by the technology department, and the provision of the outline measurement.
The equipment location,except for the requirement of the craft,should consider the factors as below:
(1)Condition of products processing  
(2)Convenience for putting,transporting and clearing,match the request of position and culturly producing.
(3)Satisfaction of the requirement of installing fixing and operating.
(4)Span of the factory,wideth and heigth of the door. Necessary space of operating.
(5)The labor pretecton of the main eletricity source, main gas source, water input and output.

Installing the equipment need to be horizontal and parallel. Its purpose is to make it stable,lighten the vibration,avoid being out of shape. Then film can be in the line and flat ,have equal tension,prevent unreasonable fret and keep the processing precision,etc.
Finding the horizontal and parallel line must firstly have the basic plane,installing the mat iron and selecting the ground screw, make sure the horizontal difference is 0.05mm,and the parallel one is 0.1mm.